| Bosto Dam |
Bomet |
Within Mau forest |
Bomet |
18.82Mm³ |
2.5GW |
80,300 |
Under study |
11.4B |
Appraisal studies are on-going. To be executed through FDB consortium |
|
| Radat Dam |
Marigat |
Pekera |
Baringo |
124Mm³ |
1MW (existing) |
Existing |
836,898 |
58,000 |
96.3B |
Dam exists. Study ongoing to include irrigation component |
| Isiolo Dam |
Oldonyiro |
Ewaso Nyiro |
Isiolo |
315Mm³ |
- |
25,000 |
- |
1,350 |
25.4B |
Study review ongoing |
| Lowat Dam |
Turkana East |
Kerio |
Turkana |
384Mm³ |
9.3 |
17,280 |
Morulem, Lokubae, Elelea |
37,500 |
35B |
Under studies. Includes tourism, police station, fish farming |
| Lower Turkwel Dam |
Turkana, West Pokot |
Turkwel |
West Pokot/Turkana |
1.2Mm³/day |
- |
Existing |
- |
78,000 |
24.42B |
Study review ongoing for irrigation component |
| New Gogo Dam |
Migori |
Kuja |
Migori/Homa Bay |
348Mm³ |
16.25MW |
- |
2.6MCM/day |
67,500 |
235.5B |
Study review ongoing for irrigation, domestic, and hydro-power |
| Bura Irrigation Scheme (non-dam) |
Hola, Mandogo |
Tana |
Tana River |
93.7MCM |
2.5MW |
- |
72,000 |
30,000 |
150.8B |
Feasibility studies ongoing for intake expansion and crops |
| Thwake Dam Downstream |
Kitui, Makueni |
Thwake, Athi |
Kitui, Makueni |
- |
19.46MW |
144,901 |
- |
100,000 |
58.8B |
Existing dam. Components being added |