PPP Projects

PPP Projects

 

Project Name Location River County Volume (m³) HEP (MW) Domestic (m³/day) Irrigation (m³/day) Acres Est. Cost (KES) Status
Bosto Dam Bomet Within Mau forest Bomet 18.82Mm³ 2.5GW 80,300 Under study 11.4B Appraisal studies are on-going. To be executed through FDB consortium  
Radat Dam Marigat Pekera Baringo 124Mm³ 1MW (existing) Existing 836,898 58,000 96.3B Dam exists. Study ongoing to include irrigation component
Isiolo Dam Oldonyiro Ewaso Nyiro Isiolo 315Mm³ - 25,000 - 1,350 25.4B Study review ongoing
Lowat Dam Turkana East Kerio Turkana 384Mm³ 9.3 17,280 Morulem, Lokubae, Elelea 37,500 35B Under studies. Includes tourism, police station, fish farming
Lower Turkwel Dam Turkana, West Pokot Turkwel West Pokot/Turkana 1.2Mm³/day - Existing - 78,000 24.42B Study review ongoing for irrigation component
New Gogo Dam Migori Kuja Migori/Homa Bay 348Mm³ 16.25MW - 2.6MCM/day 67,500 235.5B Study review ongoing for irrigation, domestic, and hydro-power
Bura Irrigation Scheme (non-dam) Hola, Mandogo Tana Tana River 93.7MCM 2.5MW - 72,000 30,000 150.8B Feasibility studies ongoing for intake expansion and crops
Thwake Dam Downstream Kitui, Makueni Thwake, Athi Kitui, Makueni - 19.46MW 144,901 - 100,000 58.8B Existing dam. Components being added